The construction of a new leisure Centre in Chard which included:
Works included sheet piling earthworks for the new swimming pools. Reinforced concrete foundations.
Reinforced concrete ground floor slab, inclusive of extensive dpm/gas membrane and slab insulation.
Drainage systems including 3 storm attenuation tanks.
External works including linear drainage, kerbing, paving, tarmac.
Street furniture including cycle hoops, protection bollards.