DPD Super Hub

January 2017 to October 2017


Project Overview

Client: Forestcrest Developments

Project Name: DPD Super Hub

Location: Roche, Cornwall

Sector: Industrial

Project Value: £2.7M

Engineer/Architect: Vale Design / Allen

Project Period: January 2017 to October 2017

Churngold acted as Principle Contractor for Forestcrest Developments to build a 60,000 sqft warehouse. The warehouse is to be used as a parcel sorting and distribution depot for DPD.

The site was situated near a live railway and had a live high pressure trunk main running through the center and there was also live high voltage overhead cable passing over the site. DPD needed to occupy the property prior to the Christmas period and the project was successfully completed and handed over early.

Contract Works

Churngold used their nationally renowned experience in delivering the full range of Groundworks solutions to deliver the following works:

  • Earthworks and Cement Stabilisation

  • Foundations

  • FM2 Warehouse floor slab 5500m2

  • Dock Levellers

  • Soakaways and Attenuation Pond

  • Linear Drainage

  • Concrete Service Yard 8000m2

  • Surfacing and white lining

  • Paving

  • New ducting and services

  • Construction of Sub-station

  • Pre Cast and insitu reinforced concrete retaining walls

  • Street Lighting

Challenges Successfully Managed

  • Poor Ground conditions

  • High Pressure Gas Main

  • Existing Services

  • High Voltage Overhead Cables

  • Close to Railway

  • Tight Programme