Churngold acted as Principle Contractor for Forestcrest Developments to build a 60,000 sqft warehouse. The warehouse is to be used as a parcel sorting and distribution depot for DPD.
The site was situated near a live railway and had a live high pressure trunk main running through the center and there was also live high voltage overhead cable passing over the site. DPD needed to occupy the property prior to the Christmas period and the project was successfully completed and handed over early.
Churngold used their nationally renowned experience in delivering the full range of Groundworks solutions to deliver the following works:
Earthworks and Cement Stabilisation
Foundations
FM2 Warehouse floor slab 5500m2
Dock Levellers
Soakaways and Attenuation Pond
Linear Drainage
Concrete Service Yard 8000m2
Surfacing and white lining
Paving
New ducting and services
Construction of Sub-station
Pre Cast and insitu reinforced concrete retaining walls
Street Lighting
Poor Ground conditions
High Pressure Gas Main
Existing Services
High Voltage Overhead Cables
Close to Railway
Tight Programme