Land East of Harry Stoke, Earthworks and Infrastructure

October 2020 to September 2024


Project Overview

Client: WainHomes/SGC

Project Name: Land East of Harry Stoke, Earthworks and Infrastructure

Location: Harry Stoke Bristol

Sector: Residential

Project Value: £5.1M

Engineer/Architect: Stantec / The Engineering Studio

Project Period: October 2020 to September 2024

Design and Build contract to construct an adoptable spine road with drainage and mains services that runs through the re modelled former Mulgrove Farm which will feed further housing plots.

The spine road contract is being carried out following on from a completed section of the £5.1M Earthwork contract also undertaken by Churngold Construction for Wainhomes and South Gloucestershire Council.